Metal structures fabrication & installation

Frames, platforms, galleries and bridge structures with in-house detailing

What fabrication and installation include

We offer professional fabrication and erection of steel structures of any complexity. We carry out the full scope of work — from developing structural solutions and fabricating steel members to their delivery, erection and installation directly on site.

We fabricate steel structures to custom designs and to the client’s technical specifications. We work on facilities of various purposes, ensuring high quality of workmanship, reliability and accuracy of every member.

Our main areas of work

  • Fabrication of steel frames for buildings and structures.
  • Fabrication of hangars, canopies and warehouse structures.
  • Production of trusses, beams, columns and steel floors.
  • Fabrication of stairs, fences, platforms and other steel products.
  • Fabrication of structures to the client’s drawings.
  • Erection of steel structures of any complexity.

Erection by our own crews

We do not only fabricate steel structures — we also erect them with our own qualified crews. This allows us to control quality at every stage of the work, keep to the agreed deadlines and ensure that the structures are installed correctly in accordance with the design documentation.

Steel frame of a multi-bay building: columns, girders and roof purlins before cladding

Why choose us?

  • An individual approach to every order.
  • Fabrication of steel structures of any complexity.
  • A comprehensive approach — from fabrication to erection.
  • Our own erection crews and hands-on experience.
  • Quality control at every stage.
  • Meeting the agreed order deadlines.

We are ready to deliver both small custom orders and large-scale industrial and commercial projects.

Contact us — we will fabricate and erect steel structures to suit your needs, technical requirements and wishes!

Filter housing with a flue duct branch, welded in the shop before dispatch

Technical parameters

Monthly output
up to 200 t
Corrosion protection
shot or sand blasting; primer and paint, hot-dip galvanising, metallising, cold galvanising
Execution class
EXC2 to EN 1090-1
Welding quality system
DIN EN ISO 3834-3, steel up to 40 mm

Limits

  • Stainless steel and aluminium structures are not part of the standard scope — the need for them is agreed separately.
  • We do not fabricate without detailed drawings: if there is no detailing package, we produce it first.
  • Process equipment mounted on the structures is supplied and located by its own manufacturer.
  • Work on a running production line is planned separately — it depends on the shutdown schedule.

Production building frame

The frame of a production building in a shop-drawing (KMD) model: 1,840 beams, 373 columns, 224 plates. The model contains all elements supplied to site.

Three-dimensional model of the steel frame of a production hall: portal frames, roof trusses and bracing, seen from the side and slightly aboveShop-drawing model
Members
2,437
Beams
1,840
Columns
373
Plates
224
Footprint
91.8 × 50.5 m
Height
19.7 m

Design and build

Model of a conveyor gallery on supports with trusses and bracing
Design
Erected conveyor gallery on steel supports with a lift tower on an industrial site
Built

Typical facilities

  • 01Workshops, warehouses, hangars and production buildings
  • 02Bridges, overpasses and road infrastructure
  • 03Transfer galleries, trestles and conveyor lines
  • 04Elevators, hoppers and agricultural complexes
  • 05Fuel stations and roadside service facilities
  • 06Recreational facilities and street furniture units

How we work

01

Shop drawings

We produce the detailed shop drawings for the steel structures. At this stage we take into account the transport and erection conditions for each element.

02

Production

Elements are fabricated at our own facility: cutting, assembly, welding and geometry control of the joints.

03

Corrosion protection

We prepare the surface and apply the protective coating, choosing the coating system for the facility’s operating conditions.

04

Method statement & gear

We draw up the method statement and technology card and select cranes and lifting gear for the weight and reach involved.

05

Erection

Assembly, welding and fastening of the structures on site, including work at height and thermal cutting.

06

Handover

We check geometry, welds and coating, clear any defects and hand the facility over to the client.

Frequently asked questions

How much do metal structures cost?

The exact price is calculated by a manager on the basis of the technical brief or drawings. It depends on the tonnage of steel, the complexity of the joints, the corrosion protection system, erection, logistics and the schedule. The price is determined on the basis of the estimate. An accurate estimate requires KM or KMD drawings; an estimate based on a sketch is possible, but with a larger contingency.

What are the fabrication and erection lead times?

The lead time depends on the size of the order and the current workload of the production facility. To determine it, we require the parameters of the structure: tonnage, element dimensions, site conditions and the required erection sequence. Where the deadline is critical, we agree phased delivery: erection starts with the first batch while the remainder is being fabricated.

Do you carry out erection at height?

Yes. We use steeplejack and rope access methods and hold the required permit for work at height, as well as the permit for work with oxy-fuel equipment. For every erection job we draw up a method statement and a technology card — without them the crew does not go on site.

Do you erect structures made by other manufacturers?

Yes, the full scope of assembly and erection works is a separate service. This requires the drawings of the structure and the possibility of assessing its load-bearing capacity; the method statement is prepared on the basis of that assessment. If safe erection of the structure in its fabricated form is not possible, we inform the client.

Do you work in Europe?

Yes. We carry out steelwork and dismantling both in Ukraine and in European countries. Logistics, documentation requirements and site working conditions are agreed for each facility separately. For European sites we clarify in advance which codes the documentation on the structures has to follow.

Send a request

Send a description of the task or the drawings and we will prepare a technical solution and a cost calculation.

Cost estimate for the works

Send us drawings or a technical specification and we will prepare a technical solution and a cost estimate.