Dismantling of a sugar plant’s process equipment intact for re-erection on another site.

Scope of works

Marking into erection blocks, non-destructive dismantling of process equipment and steel structures, lifting the units out by crane, preparation for transport.

01

Task

A sugar plant in Osijek, Croatia: the process equipment — vessels, drums, pipework — together with the steel platforms and stairs had to be dismantled intact, so that it could be re-erected on another site. The equipment, built in 1980 (Đuro Đaković, Slavonski Brod), is located on several levels under the roof of the building with dense pipework, so each unit was removed in a confined space between adjacent units.

02

Solution

Before work began, the equipment was marked into erection blocks and each block was numbered (marks B4–B7) so that on re-erection every unit is installed in its original position. Utilities were disconnected, the pipework removed, then the vessels and steel structures were taken apart level by level from the platforms and scaffolding. Large units were lifted out of the building by mobile crane and laid out on the yard for packing and shipment. The work was carried out by our own crews on a site in the EU in accordance with the occupational safety rules of the country of execution.